All projects

Residential

Monolith House

Client

Private Client

Location

Oslo, NO

Year

2022

Area

640 m²

Duration

14 months

Sector

Residential

(01) Overview

A private residence cast in a single continuous pour of pigmented concrete, cantilevering nine metres over the fjord slope.

(02) The build

The brief

Private Client came to us with a site most contractors would have walked away from. A private residence cast in a single continuous pour of pigmented concrete, cantilevering nine metres over the fjord slope. Our job was to turn a complicated programme into a sequence anyone on site could follow.

How we built it

We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.

The result

Handed over in 14 months across 640 m², on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.

Next project

All projects

Residential

Monolith House

Client

Private Client

Location

Oslo, NO

Year

2022

Area

640 m²

Duration

14 months

Sector

Residential

(01) Overview

A private residence cast in a single continuous pour of pigmented concrete, cantilevering nine metres over the fjord slope.

(02) The build

The brief

Private Client came to us with a site most contractors would have walked away from. A private residence cast in a single continuous pour of pigmented concrete, cantilevering nine metres over the fjord slope. Our job was to turn a complicated programme into a sequence anyone on site could follow.

How we built it

We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.

The result

Handed over in 14 months across 640 m², on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.

Next project

Create a free website with Framer, the website builder loved by startups, designers and agencies.