
Client
Private Client
Location
Oslo, NO
Year
2022
Area
640 m²
Duration
14 months
Sector
Residential
(01) Overview
A private residence cast in a single continuous pour of pigmented concrete, cantilevering nine metres over the fjord slope.
(02) The build
The brief
Private Client came to us with a site most contractors would have walked away from. A private residence cast in a single continuous pour of pigmented concrete, cantilevering nine metres over the fjord slope. Our job was to turn a complicated programme into a sequence anyone on site could follow.
How we built it
We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.
The result
Handed over in 14 months across 640 m², on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.



Next project

Client
Private Client
Location
Oslo, NO
Year
2022
Area
640 m²
Duration
14 months
Sector
Residential
(01) Overview
A private residence cast in a single continuous pour of pigmented concrete, cantilevering nine metres over the fjord slope.
(02) The build
The brief
Private Client came to us with a site most contractors would have walked away from. A private residence cast in a single continuous pour of pigmented concrete, cantilevering nine metres over the fjord slope. Our job was to turn a complicated programme into a sequence anyone on site could follow.
How we built it
We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.
The result
Handed over in 14 months across 640 m², on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.



Next project