Est. 1987 · Rotterdam — New York — Oslo

L01

L02
42 floors topped out this year
42 floors topped out this year
42 floors topped out this year

L04

L05

L06
We build what stands.
Raw Structure is a design-build contractor for towers, bridges and industrial buildings — engineered with obsessive precision and delivered without drama.
Raw Structure is a design-build contractor for towers, bridges and industrial buildings — engineered with obsessive precision and delivered without drama.
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
(01) Who we are
For 38 years we have turned dirt, steel and concrete into places people trust with their lives. No shortcuts. No surprises. Just structures engineered to outlast the people who built them.
Trusted by developers, cities & industry
(02) What we do
Five disciplines. One accountable team.
(03) How we build
Floor by floor. No step skipped.
Level 00
Week 0–4
01
01
01
Survey
We read the site before we touch it: geotech, groundwater, utilities, neighbours and logistics — mapped, scanned and priced.

Level 01
Week 4–12
02
02
02
Excavate
Shoring, dewatering and bulk earthworks sequenced around live streets, with real-time monitoring on every retaining wall.

Level 02
Week 12–24
03
03
03
Foundation
Piles, rafts and cores poured to tolerance. Every cube tested, every rebar cage photographed and logged before the pour.

Level 03
Month 6–18
04
04
04
Frame
Steel and concrete rise floor by floor with jump-form cores, just-in-time deliveries and a crane plan updated daily.

Level 04
Month 18+
05
05
05
Handover
Commissioning, snagging and a digital twin of the finished building — delivered with the keys, not six months later.

(04) Selected work
Structures we’ve signed our name on.
Drag to explore →






(01) Years building
Since a single excavator in 1987.
(02) Projects delivered
Towers, bridges, plants and homes.
(03) Safe work hours
Without a lost-time incident.
(04) People on payroll
Engineers, foremen and trades.


Drawing → Landmark
Drawing → Landmark
Meridian Tower · Rotterdam · 2025
(05) Client words
What people say after handover.
“They handed over Meridian Tower five weeks early and the snag list fit on one page. I have never seen that in 25 years of development.”
“They handed over Meridian Tower five weeks early and the snag list fit on one page. I have never seen that in 25 years of development.”

Ilse van Dijk
CEO, Meridian Holdings
“Raw Structure closed zero shipping lanes during the Kessel Bridge launch. Their temporary works engineering was simply world class.”
“Raw Structure closed zero shipping lanes during the Kessel Bridge launch. Their temporary works engineering was simply world class.”

Markus Brandt
Head of Infrastructure, City of Hamburg
“On a live hospital campus, noise and vibration were everything. They built around our patients like it was their own family inside.”
“On a live hospital campus, noise and vibration were everything. They built around our patients like it was their own family inside.”

Dr. Freja Holm
Programme Director, Atlas Clinic
(06) From the site office
Field notes & engineering.
Est. 1987 · Rotterdam — New York — Oslo

L01

L02
42 floors topped out this year
42 floors topped out this year
42 floors topped out this year

L04

L05

L06
We build what stands.
Raw Structure is a design-build contractor for towers, bridges and industrial buildings — engineered with obsessive precision and delivered without drama.
Raw Structure is a design-build contractor for towers, bridges and industrial buildings — engineered with obsessive precision and delivered without drama.
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
Design & Build
Structural Steel
Civil Works
Retrofit
General Contracting
Zero Harm
(01) Who we are
For 38 years we have turned dirt, steel and concrete into places people trust with their lives. No shortcuts. No surprises. Just structures engineered to outlast the people who built them.
Trusted by developers, cities & industry
(02) What we do
Five disciplines. One accountable team.
(03) How we build
Floor by floor. No step skipped.
Level 00
Week 0–4
01
01
01
Survey
We read the site before we touch it: geotech, groundwater, utilities, neighbours and logistics — mapped, scanned and priced.

Level 01
Week 4–12
02
02
02
Excavate
Shoring, dewatering and bulk earthworks sequenced around live streets, with real-time monitoring on every retaining wall.

Level 02
Week 12–24
03
03
03
Foundation
Piles, rafts and cores poured to tolerance. Every cube tested, every rebar cage photographed and logged before the pour.

Level 03
Month 6–18
04
04
04
Frame
Steel and concrete rise floor by floor with jump-form cores, just-in-time deliveries and a crane plan updated daily.

Level 04
Month 18+
05
05
05
Handover
Commissioning, snagging and a digital twin of the finished building — delivered with the keys, not six months later.

(04) Selected work
Structures we’ve signed our name on.
Drag to explore →






(01) Years building
Since a single excavator in 1987.
(02) Projects delivered
Towers, bridges, plants and homes.
(03) Safe work hours
Without a lost-time incident.
(04) People on payroll
Engineers, foremen and trades.


Drawing → Landmark
Drawing → Landmark
Meridian Tower · Rotterdam · 2025
(05) Client words
What people say after handover.
“They handed over Meridian Tower five weeks early and the snag list fit on one page. I have never seen that in 25 years of development.”
“They handed over Meridian Tower five weeks early and the snag list fit on one page. I have never seen that in 25 years of development.”

Ilse van Dijk
CEO, Meridian Holdings
“Raw Structure closed zero shipping lanes during the Kessel Bridge launch. Their temporary works engineering was simply world class.”
“Raw Structure closed zero shipping lanes during the Kessel Bridge launch. Their temporary works engineering was simply world class.”

Markus Brandt
Head of Infrastructure, City of Hamburg
“On a live hospital campus, noise and vibration were everything. They built around our patients like it was their own family inside.”
“On a live hospital campus, noise and vibration were everything. They built around our patients like it was their own family inside.”

Dr. Freja Holm
Programme Director, Atlas Clinic
(06) From the site office





