Five ways we move earth.

From the first borehole to the last snag, one team carries the risk. Pick a single discipline or hand us the whole programme.

From the first borehole to the last snag, one team carries the risk. Pick a single discipline or hand us the whole programme.

01

01

01

General Contracting

Single point of responsibility

From mobilisation to handover, one accountable team runs programme, cost, quality and safety across every trade on site.

Programme · Cost control · Site management

02

02

02

Design & Build

Drawings and delivery, fused

Architects, engineers and builders around one table from day one — fewer RFIs, faster decisions, fixed price earlier.

Concept · BIM · Fixed price

03

03

03

Structural Steel

Frames that go up fast

In-house detailing, fabrication partners and erection crews for high-rise cores, long-span halls and exposed architectural steel.

Detailing · Fabrication · Erection

04

04

04

Civil & Infrastructure

Bridges, roads, utilities

Heavy civil works delivered on live networks — staged traffic management, marine works and deep excavations.

Bridges · Earthworks · Utilities

05

05

05

Renovation & Retrofit

New life for old structures

Structural strengthening, facade replacement and energy retrofits for occupied buildings and listed heritage assets.

Heritage · Retrofit · Fit-out

(02) Capability sheet

The numbers behind the promise.

01

Max. building height

Slip-form and jump-form cores

320 m

320 m

320 m

02

Longest bridge span

Cable-stayed, balanced cantilever

420 m

420 m

420 m

03

Crane fleet

Tower, crawler and mobile up to 750 t

38 units

38 units

38 units

04

Steel erected per year

In-house detailing and erection

24 000 t

24 000 t

24 000 t

05

Concrete poured per year

Low-carbon mixes on 70% of pours

310 000 m³

310 000 m³

310 000 m³

06

BIM maturity

Digital twin on every handover

ISO 19650

ISO 19650

ISO 19650

(03) Questions

Before you break ground.

When should we bring you in?

Ideally before planning submission. Early contractor involvement lets us price risk, test buildability and lock long-lead items — usually saving 6–12% on the final account.

Do you work outside the Netherlands?

Can you take on a project mid-way?

How do you guarantee cost certainty?

What does your safety record look like?

Five ways we move earth.

From the first borehole to the last snag, one team carries the risk. Pick a single discipline or hand us the whole programme.

From the first borehole to the last snag, one team carries the risk. Pick a single discipline or hand us the whole programme.

01

01

01

General Contracting

Single point of responsibility

From mobilisation to handover, one accountable team runs programme, cost, quality and safety across every trade on site.

Programme · Cost control · Site management

02

02

02

Design & Build

Drawings and delivery, fused

Architects, engineers and builders around one table from day one — fewer RFIs, faster decisions, fixed price earlier.

Concept · BIM · Fixed price

03

03

03

Structural Steel

Frames that go up fast

In-house detailing, fabrication partners and erection crews for high-rise cores, long-span halls and exposed architectural steel.

Detailing · Fabrication · Erection

04

04

04

Civil & Infrastructure

Bridges, roads, utilities

Heavy civil works delivered on live networks — staged traffic management, marine works and deep excavations.

Bridges · Earthworks · Utilities

05

05

05

Renovation & Retrofit

New life for old structures

Structural strengthening, facade replacement and energy retrofits for occupied buildings and listed heritage assets.

Heritage · Retrofit · Fit-out

(02) Capability sheet

The numbers behind the promise.

01

Max. building height

Slip-form and jump-form cores

320 m

320 m

320 m

02

Longest bridge span

Cable-stayed, balanced cantilever

420 m

420 m

420 m

03

Crane fleet

Tower, crawler and mobile up to 750 t

38 units

38 units

38 units

04

Steel erected per year

In-house detailing and erection

24 000 t

24 000 t

24 000 t

05

Concrete poured per year

Low-carbon mixes on 70% of pours

310 000 m³

310 000 m³

310 000 m³

06

BIM maturity

Digital twin on every handover

ISO 19650

ISO 19650

ISO 19650

(03) Questions

Before you break ground.

When should we bring you in?

Ideally before planning submission. Early contractor involvement lets us price risk, test buildability and lock long-lead items — usually saving 6–12% on the final account.

Do you work outside the Netherlands?

Can you take on a project mid-way?

How do you guarantee cost certainty?

What does your safety record look like?

Create a free website with Framer, the website builder loved by startups, designers and agencies.