All projects

Healthcare

Atlas Clinic

Client

Region Hovedstaden

Location

Copenhagen, DK

Year

2023

Area

17,200 m²

Duration

28 months

Sector

Healthcare

(01) Overview

A research hospital wing built on a live medical campus modular MEP risers, vibration-isolated labs and a precast facade.

(02) The build

The brief

Region Hovedstaden came to us with a site most contractors would have walked away from. A research hospital wing built on a live medical campus — modular MEP risers, vibration-isolated labs and a precast facade. Our job was to turn a complicated programme into a sequence anyone on site could follow.

How we built it

We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.

The result

Handed over in 28 months across 17,200 m², on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.

Next project

Monolith House

All projects

Healthcare

Atlas Clinic

Client

Region Hovedstaden

Location

Copenhagen, DK

Year

2023

Area

17,200 m²

Duration

28 months

Sector

Healthcare

(01) Overview

A research hospital wing built on a live medical campus modular MEP risers, vibration-isolated labs and a precast facade.

(02) The build

The brief

Region Hovedstaden came to us with a site most contractors would have walked away from. A research hospital wing built on a live medical campus — modular MEP risers, vibration-isolated labs and a precast facade. Our job was to turn a complicated programme into a sequence anyone on site could follow.

How we built it

We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.

The result

Handed over in 28 months across 17,200 m², on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.

Next project

Monolith House