All projects

Residential

Foundry Lofts

Client

Foundry Living

Location

Brooklyn, NY

Year

2024

Area

21,500 m²

Duration

22 months

Sector

Residential

(01) Overview

Adaptive reuse of a 1920s iron foundry into 180 loft residences original brick shell retained, new board-formed concrete within.

(02) The build

The brief

Foundry Living came to us with a site most contractors would have walked away from. Adaptive reuse of a 1920s iron foundry into 180 loft residences — original brick shell retained, new board-formed concrete within. Our job was to turn a complicated programme into a sequence anyone on site could follow.

How we built it

We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.

The result

Handed over in 22 months across 21,500 m², on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.

Next project

Northgate Logistics Hub

All projects

Residential

Foundry Lofts

Client

Foundry Living

Location

Brooklyn, NY

Year

2024

Area

21,500 m²

Duration

22 months

Sector

Residential

(01) Overview

Adaptive reuse of a 1920s iron foundry into 180 loft residences original brick shell retained, new board-formed concrete within.

(02) The build

The brief

Foundry Living came to us with a site most contractors would have walked away from. Adaptive reuse of a 1920s iron foundry into 180 loft residences — original brick shell retained, new board-formed concrete within. Our job was to turn a complicated programme into a sequence anyone on site could follow.

How we built it

We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.

The result

Handed over in 22 months across 21,500 m², on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.