All projects

Industrial

Northgate Logistics Hub

Client

Northgate Estates

Location

Leeds, UK

Year

2023

Area

64,000 m²

Duration

18 months

Sector

Industrial

(01) Overview

A net-zero-ready distribution campus with a 32 m clear-height steel frame, delivered five weeks ahead of programme.

(02) The build

The brief

Northgate Estates came to us with a site most contractors would have walked away from. A net-zero-ready distribution campus with a 32 m clear-height steel frame, delivered five weeks ahead of programme. Our job was to turn a complicated programme into a sequence anyone on site could follow.

How we built it

We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.

The result

Handed over in 18 months across 64,000 m², on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.

Next project

Atlas Clinic

All projects

Industrial

Northgate Logistics Hub

Client

Northgate Estates

Location

Leeds, UK

Year

2023

Area

64,000 m²

Duration

18 months

Sector

Industrial

(01) Overview

A net-zero-ready distribution campus with a 32 m clear-height steel frame, delivered five weeks ahead of programme.

(02) The build

The brief

Northgate Estates came to us with a site most contractors would have walked away from. A net-zero-ready distribution campus with a 32 m clear-height steel frame, delivered five weeks ahead of programme. Our job was to turn a complicated programme into a sequence anyone on site could follow.

How we built it

We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.

The result

Handed over in 18 months across 64,000 m², on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.