(01) Overview

A cable-stayed crossing over the Elbe, launched segment by segment over live shipping lanes without a single day of river closure.

(02) The build

The brief

City of Hamburg came to us with a site most contractors would have walked away from. A cable-stayed crossing over the Elbe, launched segment by segment over live shipping lanes without a single day of river closure. Our job was to turn a complicated programme into a sequence anyone on site could follow.

How we built it

We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.

The result

Handed over in 26 months across 420 m span, on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.

Next project

Foundry Lofts

All projects

Infrastructure

Kessel Bridge

Client

City of Hamburg

Location

Hamburg, DE

Year

2024

Area

420 m span

Duration

26 months

Sector

Infrastructure

(01) Overview

A cable-stayed crossing over the Elbe, launched segment by segment over live shipping lanes without a single day of river closure.

(02) The build

The brief

City of Hamburg came to us with a site most contractors would have walked away from. A cable-stayed crossing over the Elbe, launched segment by segment over live shipping lanes without a single day of river closure. Our job was to turn a complicated programme into a sequence anyone on site could follow.

How we built it

We front-loaded the risk: laser-scanned the existing conditions, modelled every temporary works stage in 4D and locked long-lead steel before ground was broken. Prefabricated assemblies arrived just in time, which kept the site clear and the crane cycles short.

The result

Handed over in 26 months across 420 m span, on budget and with a safety record we are proud to publish. The building now does exactly what the drawings promised — and it will keep doing it for the next hundred years.