Est. 1987 · Rotterdam — New York — Oslo

L01

L02

42 floors topped out this year

42 floors topped out this year

42 floors topped out this year

L04

L05

L06

We build what stands.

Raw Structure is a design-build contractor for towers, bridges and industrial buildings — engineered with obsessive precision and delivered without drama.

Raw Structure is a design-build contractor for towers, bridges and industrial buildings — engineered with obsessive precision and delivered without drama.

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

(01) Who we are

For 38 years we have turned dirt, steel and concrete into places people trust with their lives. No shortcuts. No surprises. Just structures engineered to outlast the people who built them.

Trusted by developers, cities & industry

(02) What we do

Five disciplines. One accountable team.

(03) How we build

Floor by floor. No step skipped.

Level 00

Week 0–4

01

01

01

Survey

We read the site before we touch it: geotech, groundwater, utilities, neighbours and logistics — mapped, scanned and priced.

Level 01

Week 4–12

02

02

02

Excavate

Shoring, dewatering and bulk earthworks sequenced around live streets, with real-time monitoring on every retaining wall.

Level 02

Week 12–24

03

03

03

Foundation

Piles, rafts and cores poured to tolerance. Every cube tested, every rebar cage photographed and logged before the pour.

Level 03

Month 6–18

04

04

04

Frame

Steel and concrete rise floor by floor with jump-form cores, just-in-time deliveries and a crane plan updated daily.

Level 04

Month 18+

05

05

05

Handover

Commissioning, snagging and a digital twin of the finished building — delivered with the keys, not six months later.

(04) Selected work

Structures we’ve signed our name on.

Drag to explore →

(01) Years building

0+

Since a single excavator in 1987.

(02) Projects delivered

0+

Towers, bridges, plants and homes.

(03) Safe work hours

0.0M

Without a lost-time incident.

(04) People on payroll

0+

Engineers, foremen and trades.

Drawing → Landmark

Drawing → Landmark

Meridian Tower · Rotterdam · 2025

(05) Client words

What people say after handover.

“They handed over Meridian Tower five weeks early and the snag list fit on one page. I have never seen that in 25 years of development.”

“They handed over Meridian Tower five weeks early and the snag list fit on one page. I have never seen that in 25 years of development.”

Ilse van Dijk

CEO, Meridian Holdings

“Raw Structure closed zero shipping lanes during the Kessel Bridge launch. Their temporary works engineering was simply world class.”

“Raw Structure closed zero shipping lanes during the Kessel Bridge launch. Their temporary works engineering was simply world class.”

Markus Brandt

Head of Infrastructure, City of Hamburg

“On a live hospital campus, noise and vibration were everything. They built around our patients like it was their own family inside.”

“On a live hospital campus, noise and vibration were everything. They built around our patients like it was their own family inside.”

Dr. Freja Holm

Programme Director, Atlas Clinic

(06) From the site office

Field notes & engineering.

Est. 1987 · Rotterdam — New York — Oslo

L01

L02

42 floors topped out this year

42 floors topped out this year

42 floors topped out this year

L04

L05

L06

We build what stands.

Raw Structure is a design-build contractor for towers, bridges and industrial buildings — engineered with obsessive precision and delivered without drama.

Raw Structure is a design-build contractor for towers, bridges and industrial buildings — engineered with obsessive precision and delivered without drama.

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

  • Design & Build

  • Structural Steel

  • Civil Works

  • Retrofit

  • General Contracting

  • Zero Harm

(01) Who we are

For 38 years we have turned dirt, steel and concrete into places people trust with their lives. No shortcuts. No surprises. Just structures engineered to outlast the people who built them.

Trusted by developers, cities & industry

(02) What we do

Five disciplines. One accountable team.

(03) How we build

Floor by floor. No step skipped.

Level 00

Week 0–4

01

01

01

Survey

We read the site before we touch it: geotech, groundwater, utilities, neighbours and logistics — mapped, scanned and priced.

Level 01

Week 4–12

02

02

02

Excavate

Shoring, dewatering and bulk earthworks sequenced around live streets, with real-time monitoring on every retaining wall.

Level 02

Week 12–24

03

03

03

Foundation

Piles, rafts and cores poured to tolerance. Every cube tested, every rebar cage photographed and logged before the pour.

Level 03

Month 6–18

04

04

04

Frame

Steel and concrete rise floor by floor with jump-form cores, just-in-time deliveries and a crane plan updated daily.

Level 04

Month 18+

05

05

05

Handover

Commissioning, snagging and a digital twin of the finished building — delivered with the keys, not six months later.

(04) Selected work

Structures we’ve signed our name on.

Drag to explore →

(01) Years building

0+

Since a single excavator in 1987.

(02) Projects delivered

0+

Towers, bridges, plants and homes.

(03) Safe work hours

0.0M

Without a lost-time incident.

(04) People on payroll

0+

Engineers, foremen and trades.

Drawing → Landmark

Drawing → Landmark

Meridian Tower · Rotterdam · 2025

(05) Client words

What people say after handover.

“They handed over Meridian Tower five weeks early and the snag list fit on one page. I have never seen that in 25 years of development.”

“They handed over Meridian Tower five weeks early and the snag list fit on one page. I have never seen that in 25 years of development.”

Ilse van Dijk

CEO, Meridian Holdings

“Raw Structure closed zero shipping lanes during the Kessel Bridge launch. Their temporary works engineering was simply world class.”

“Raw Structure closed zero shipping lanes during the Kessel Bridge launch. Their temporary works engineering was simply world class.”

Markus Brandt

Head of Infrastructure, City of Hamburg

“On a live hospital campus, noise and vibration were everything. They built around our patients like it was their own family inside.”

“On a live hospital campus, noise and vibration were everything. They built around our patients like it was their own family inside.”

Dr. Freja Holm

Programme Director, Atlas Clinic

(06) From the site office

Field notes & engineering.

Create a free website with Framer, the website builder loved by startups, designers and agencies.